Bandia Quote~

  1. Divide the area marked on the diagram to repair the window edge: measure the position on-site, use a six-point white glue board to reseal (severely damaged areas will be removed first). Remove the original curtains, re-make the straight curtains for that position, and install them (the roller blinds do not need to be replaced). Apply three-proof oil as a base and then paint over the water stains on the window edge!

(The above project includes all materials, re-making and installing straight curtains within the designated area, and carrying out protective cleaning and furniture moving during the project)

The project is estimated to take about 7-8 working days.

Total: $156,000