A bug was found during software testing. After it was reported by the tester, the development team proposed a solution to the problem. However, fixing the bug will be very time-consuming. According to agile methodology, who should decide on the next steps?

A: product owner B: scrum master C: tester D: You should never release to production software containing known bugs

Bug Found During Testing: Time-Consuming Fix - Who's Responsible?

原文地址: https://www.cveoy.top/t/topic/nyBW 著作权归作者所有。请勿转载和采集!

免费AI点我,无需注册和登录