Optimized Crane Bridge Operations & Truck Waiting Times: Mathematical Model Development
Researched the prevailing issues of irrational crane bridge operations and extended truck waiting periods, amongst others. Developed a mathematical planning model that minimises the cost of crane bridge movement and truck waiting times.
原文地址: https://www.cveoy.top/t/topic/lDyg 著作权归作者所有。请勿转载和采集!