Optimizing Crane Bridge Operations & Truck Waiting Times: A Mathematical Model
Researched the prevailing issues of unjustifiable crane bridge operations and extended truck waiting times, and devised a mathematical planning model with the most economical solution for crane bridge movement and truck waiting time.
原文地址: https://www.cveoy.top/t/topic/lDyJ 著作权归作者所有。请勿转载和采集!