Optimizing Crane Bridge Operations and Truck Waiting Times: A Mathematical Model for Cost Minimization
'Researched the existing issues of unreasonable crane bridge operations and long truck waiting times etc, and established a mathematical planning model with the lowest cost for crane bridge movement and truck waiting time.'
原文地址: https://www.cveoy.top/t/topic/lBYo 著作权归作者所有。请勿转载和采集!