Optimize Yard Crane Operations: Minimize Cost & Truck Waiting Time
Establish a mathematical planning model to minimize the cost of moving gantry cranes and waiting time for trucks by conducting modeling research on the unreasonable movement of existing yard cranes and excessively long waiting times for trucks.
原文地址: https://www.cveoy.top/t/topic/lBUa 著作权归作者所有。请勿转载和采集!