Minimize Field Bridge Movement and Truck Waiting Costs
Optimize and conduct modeling research to minimize the cost of field bridge movement and truck waiting time, due to the unreasonable movement and transfer during field bridge operation and the waste of terminal resources caused by long truck waiting times.
原文地址: https://www.cveoy.top/t/topic/lBFH 著作权归作者所有。请勿转载和采集!