Composite Sample Preparation Update for 9 Lots + Partial 10th Lot (ITS Sampling)
We have received your instructions and discussed the preparation of composite samples with ITS, the sampling company. Here's an update on the current situation:
Completed Sampling:
- ITS has completed sampling for 9 lots, each consisting of 5000 tons.
- Sampling for the 10th lot is partially complete, covering approximately 2300 tons.
Next Steps:
- Assuming no objections or further instructions, ITS will proportionally mix the collected samples to create a composite sample for testing.
- Sampling of the remaining cargo in silos 10 and 12 will resume in 500-ton lots once transportation resumes.
- We await your instructions on whether to test the remaining samples separately or combine them with the previous samples.
ADM Surveyor Participation:
- As per previous instructions and the charterer's surveyor's requirements on behalf of ADM, we will invite the ADM surveyor to witness the composite sample preparation.
- The tentative schedule for this is tomorrow.
Please do not hesitate to contact us if you have any questions or require further clarification.