The wire rods were stowed in the fore part of the cargo hold, positioned against the bulkhead. The steel plates were stowed on the tank top in the forward part and placed against the wire rods. The H beams were then stowed on top of the steel plates, with the steel sheet pile and steel rails positioned on top of the H beams. Finally, the pipes were stowed on top of the H beams and rails.

Cargo Stowage Plan: Wire Rods, Steel Plates, H Beams, Rails & Pipes