The installed capacity of the condensing steam power plant in this design is 4×300MW, playing a crucial role in the power system. To ensure the stability of the entire system, a reliable and flexible connection form must be adopted and qualitatively analyzed. Additionally, it is necessary to maximize the avoidance of local power limitations and transmission restrictions caused by the main connection structure during the design process. When considering the impact of environmental conditions on electrical equipment, special attention must be paid to factors such as temperature and altitude. If these factors exceed the conditions for the use of electrical equipment, corresponding measures must be taken to ensure the normal operation of the equipment.