On May 18th at 1:00 PM, the loss adjuster representing the receiver arrived at the factory. Together, we exported production data statistics from our OA system and were provided with the necessary information. Upon receiving the data, we were requested to sign the data sheet. The undersigned acknowledged receipt of the data and added the comment 'received only, but not verified' to the data sheet. Following this, we proceeded to the workshop to collect raw data and inspect the on-site measuring instruments.

Factory Data Inspection and Verification: May 18th Incident

原文地址: https://www.cveoy.top/t/topic/jl0B 著作权归作者所有。请勿转载和采集!

免费AI点我,无需注册和登录