After the necessary preparations, the loading operation for the cargo under our survey at L12 berth began at approximately 2110hrs on September 11, 2023. The loading process at L12 berth was successfully completed by 0740hrs on September 12, 2023. Subsequently, the vessel moved to the anchorage and after a few hours of waiting, it shifted to G3 berth to continue the loading process.

请修正润色After preparation at about 2110hrs on Sep 11 2023 the loading operation at L12 berth to the cargo under our survey was commenced by three shore cranes The loading operation at L12 berth was compl

原文地址: https://www.cveoy.top/t/topic/jaje 著作权归作者所有。请勿转载和采集!

免费AI点我,无需注册和登录