According to the workers' information, the replacement of the damaged parts was completed on the evening of the 26th, and a UT test was arranged afterwards. On the 27th, after preparation, the vacuum test was conducted under the witness of the class surveyor. All tests were completed and accepted at 1445hrs on the same day, and the class surveyor issued the survey report. The survey report was attached at the end. According to the report, the replaced steel plate area and thickness in the damaged area were 80063013mm. We also learned about the repair situation on-site and collected the certificates of conformity for the repair products and the welding personnel certificates.