The quantity of oil leaked will be determined through a joint survey conducted by all relevant parties, including Mr. Chenlixin, the surveyor representing the charterer, and the surveyor representing the terminal. However, this survey has been delayed due to the ongoing oil transfer from tank No. 2S to tank No. 3P. Once the transfer operation is completed, the joint survey will be conducted to determine the remaining bunker oil on board.

43 The oil quantity leakedThe oil quantity leaked will be determined after the joint survey is conducted by all relevant parties including the charterer surveyor Mr Chenlixin and the surveyor rep

原文地址: https://www.cveoy.top/t/topic/ibu3 著作权归作者所有。请勿转载和采集!

免费AI点我,无需注册和登录