In order protect to protect both of the ship and cargo interests we negotiated with the terminal to obtain the port’s signature on the LOP After long time Negotiations with the terminal they fina
To protect the interests of both the ship and cargo, we engaged in negotiations with the terminal to secure the port's signature on the LOP. After extensive discussions, the terminal eventually agreed with our viewpoint that the incident was clearly evident, and it would be a waste of time to persistently refuse to sign the LOP prepared by the Master. Finally, at approximately 1200hrs on July 19, the port authority signed the LOP.
原文地址: https://www.cveoy.top/t/topic/ibAX 著作权归作者所有。请勿转载和采集!