如果未来项目交由其执行亦或是客户在长期的产品使用中将置客户于由不合格的配置方案导致的后患无穷的境地之中 把以上这句翻译成地道的英文
"If the future projects are entrusted to them for execution or if the clients are placed in a precarious situation due to inadequate configuration schemes in long-term product usage."
原文地址: https://www.cveoy.top/t/topic/i50F 著作权归作者所有。请勿转载和采集!