The Party B is required to refine the plan in accordance with government regulations, making necessary adjustments to meet the construction requirements, including undergoing professional review, passing the construction drawing examination, and filing with the safety supervision department. The Party B must obtain the necessary construction permits within the specified time frame.

乙方必须按照政府要求完善方案调整至通过专业评审、通过施工图审查、报安全监管部门备案等符合施工的需要在规定时间内获取施工证件如何表述

原文地址: https://www.cveoy.top/t/topic/i09Y 著作权归作者所有。请勿转载和采集!

免费AI点我,无需注册和登录