请将以下内容灵活、准确地翻译成英语:7、效果检查一目标值完成情况至2021年7月珠海市香洲区夏湾村负荷持续增长附近线路负载均已重载原有箱变噪音白昼达到79分贝夜间达到68分贝周边居民深受其扰。香洲供电局对220kV拱北站10kV聚贤二线馈线组升级改造选址于拱北夏湾炮台山侧的城中村设置组合式配电房降噪系统于2021年7月31日投入运行。从8月1日起至9月19日每天安排小组成员在距离配电房门口3m处测
- Performance Check (1) Completion of Target Values As of July 2021, the load in Xiawan Village, Xiangzhou District, Zhuhai City has continued to increase. Nearby lines are already overloaded, and the original transformer box noise has reached 79 decibels during the day and 68 decibels at night, causing disturbance to nearby residents. Xiangzhou Power Supply Bureau upgraded and transformed the 220kV Gongbei Station 10kV Juxin II feeder line group, located in the urban village on the Pao Tai Shan side of Gongbei Xiawan, and installed a combination distribution room noise reduction system, which was put into operation on July 31, 2021. From August 1 to September 19, a small group was arranged to measure the noise decibels at a distance of 3 meters from the distribution room door, with a total of 50 measurements taken during the day and night. The results are summarized in Table 7-1 and Table 7-2, and the comparison with the target values after the activity is shown in Figure 7-1
原文地址: https://www.cveoy.top/t/topic/hlkw 著作权归作者所有。请勿转载和采集!