Upon completion of loading the spare parts onto the pipelayer, the spare parts were securely fastened using lashing belts with a capacity of 10 tons. These lashing belts were then fixed onto the pipelayer to ensure their stability.

Upon completion of loading the spare parts of the pipelayer the spare parts were secured using lashing belts with a capacity of 10 tons and lashing belts were fixed on the pipelayer

原文地址: https://www.cveoy.top/t/topic/hJdn 著作权归作者所有。请勿转载和采集!

免费AI点我,无需注册和登录