After the spare parts of the pipelayer were loaded they were securely fastened using lashing belts with a capacity of 10 tons These lashing belts were then fixed onto the pipelayer to ensure thei
After the spare parts of the pipelayer were loaded, they were securely fastened using 10-ton capacity lashing belts. These lashing belts were then fixed onto the pipelayer to ensure its stability.
原文地址: https://www.cveoy.top/t/topic/hJdB 著作权归作者所有。请勿转载和采集!