Upon completion of loading the pipelayer, 6 pieces of C-rings with a capacity of 25T were securely fastened to the side frames. Additionally, 6 lines of steel lashing chains with a capacity of 20T were used to lash the pipelayer and C-rings together, with 2 lines in the horizontal direction, 2 lines in the cross direction, and 2 lines in the splay direction. Furthermore, to connect the units of pipelayers, 6 lines in the horizontal direction were utilized, using steel lashing chains with a capacity of 20T.

Upon of loading completion of pipelayer 6 pieces of C-rings with 25T were fixed on side frames then 6 lines of steel lashing chains with 20T 2 lines in horizontal direction 2 lines in cross direc