Production Line No. 2 Shutdown Affects Sampling on May 2nd
Sampling began in the afternoon of May 2nd, simultaneously with production. However, due to mechanical problems, production line No. 2 was shut down in the afternoon of May 2nd, and therefore, no product samples from Line No. 2 were available. During the sampling process, our surveyor examined the condition of the samples and made note of any observations.