Q: What were the deck department's operations for the MV ECO vessel at 1450hrs on August 3, 2023, and was there any deck flushing operation?
A: At 1450hrs on August 3, 2023, the deck department crew performed the task of washing the hatch covers. During this operation, the water used for washing the hatch covers flowed into the cargo hold. Additionally, there was a water discharge from the stern of the ship. However, it is important to note that the water discharged from the stern was cooling water from the cable crane, not deck flushing water.
Q: What was the status of the cargo hatch cover during the ship's voyage at 1450hrs yesterday?
A: At 1450hrs yesterday, the cargo hatch cover was partially open. Before sailing, the captain conducted a self-inspection to ensure everything was in order, including the status of the hatch cover.