Cargo Inspection Report: Initial Bulk Inspection Conducted Due to Time Constraints
According to the consignee, all cargoes from the mentioned eight containers have been stored in their warehouse. However, due to time constraints, our surveyor conducted an initial inspection of the cargo in bulk on September 21st.
原文地址: https://www.cveoy.top/t/topic/fmZf 著作权归作者所有。请勿转载和采集!