8D REPORT

8D Number:

Date Issued:

Date Of Completion:

Issued To:

IPN:

Defect Description:

Defect DC and Quantity: (D1) Select a team and Scope Project:

Team Members:

Scope of Project:

Phase Completion Date:

(D2) Define & Describe the Problem:

Problem Statement:

Estimation of Consequences:

Other Plants Affected:

Attachments:

Phase Completion Date:

(D3) Containment (Immediate actions required to eliminate defects at supplier, manufacturing, and customer, & maintain production):

Immediate Actions Taken:

Phase Completion Date:

(D4) Identify Root Cause (Define & Verify root cause):

Failure Mechanism Description (by 5why analysis):

Reason of Non-Detection in Tests (by 5why analysis):

Identified Root Cause:

Phase Completion Date:

(D5) Permanent Corrective Action:

The following permanent corrective actions have been decided:

Permanent Corrective Action Action By Status

Phase Completion Date:

(D6) Verification of Corrective Action:

Method of Verification:

Verification Evidence:

Phase Completion Date:

(D7) Prevention: (Preventive action taken, to see this does not occur again)

FMEA update: Date:

Control Plan updated: Date:

Other: Date:

Phase Completion Date:

(D8) Recognize Team Success: (Acknowledge Team and communicate results)

Team Members:

Results Communicated to:

Phase Completion Date:

To Be Completed By Quality Assurance

Corrective Action Evaluation: Accept Reject

Review Signature_____________ Date_____________

Date/Time of Report Generation

8D report template English version8D REPORT8D Number Date IssuedDate Of CompletionIssued To IPNDefect Description Defect DC and Quantity D1 Select a team and Scope Project Phase Completion Date D2 D

原文地址: https://www.cveoy.top/t/topic/fkwf 著作权归作者所有。请勿转载和采集!

免费AI点我,无需注册和登录