帮我改写润色下面这句话:软件测试应尽快进行整个测试部分应在软件开发和设计的整个过程中进行。
It is imperative to conduct software testing as early as possible, with the entire testing phase taking place throughout the entire software development and design process.
原文地址: https://www.cveoy.top/t/topic/fimG 著作权归作者所有。请勿转载和采集!