帮我改写润色下面这句话:1软件测试应尽快进行整个测试部分应在软件开发和设计的整个过程中进行。
It is advisable to initiate software testing as early as possible, and the entire testing phase should be integrated throughout the entire software development and design process.
原文地址: https://www.cveoy.top/t/topic/fimE 著作权归作者所有。请勿转载和采集!