请翻译我们从码头处了解到来自HYDRUS的2万吨货物也已经运回工厂来自ALBATROSS的69000吨的货物预计明天开始往工厂回运。
We have learned from the dock that 20,000 tons of goods from HYDRUS have been transported back to the factory, and 69,000 tons of goods from ALBATROSS are expected to be transported back to the factory starting tomorrow.
原文地址: https://www.cveoy.top/t/topic/fhzg 著作权归作者所有。请勿转载和采集!