During a recent incident voyage, several pipes were bent. However, these bent pipes were documented in the on-hire report for the subsequent voyage after the incident voyage. This discrepancy in the on-hire report raises concerns about the accuracy and completeness of the vessel inspection process. It is crucial that all damages and defects are accurately recorded in the on-hire report for the corresponding voyage to ensure transparency, accountability, and the safety of future operations.


原文地址: https://www.cveoy.top/t/topic/fMm3 著作权归作者所有。请勿转载和采集!

免费AI点我,无需注册和登录