Based on our on-site measurements and initial calculations, we have determined that a total of 20MT of steel will need to be replaced. Taking into account the aforementioned conditions, we have estimated the total loss to be USD 250,000, which includes expenses for dry-docking, port disbursement, and repair fees. This estimate is provided for your reference.

Steel Replacement Estimate: 20MT Required, USD 250,000 Loss

原文地址: https://www.cveoy.top/t/topic/fG5r 著作权归作者所有。请勿转载和采集!

免费AI点我,无需注册和登录