Further to the matter at hand, we would like to inform you that the discharging of cargo to the vessel in question was completed at 0030hrs on June 24th, with the initial ETD scheduled for 1130hrs on the same day. The final draft survey was conducted jointly by our surveyor and the C/O from 0800hrs to 0900hrs on June 24th.

Based on our draft survey, a total of 65,548.8 MT of cargo was discharged from the vessel at the Port of Jingtang. This figure was 64.16 MT (0.098%) more than the B/L figures (65,484.64MT).

According to the Chief Officer's calculations, a total of 65,546.76 MT of cargo was discharged at the Port of Jingtang, which was 62.136 MT (0.095%) more than the B/L figures.

The Custom surveyor did not disclose their results, but they orally informed us that the quantity of cargo discharged was sufficient.

We have been informed by the local agent that the schedule was postponed to 1400hrs due to waiting for sailing channel.