请修正Sampling commenced in the afternoon of May 2 simultaneous with production However due to mechanical problems the production line No2 was shut down in the afternoon of May 2 therefore no products sa
Sampling began in the afternoon of May 2, simultaneously with production. However, due to mechanical problems, production line No. 2 was shut down in the afternoon of May 2, and therefore, no product samples from Line No. 2 were available. During the sampling process, our surveyor examined the condition of the samples and made note of any observations.
原文地址: https://www.cveoy.top/t/topic/d2xZ 著作权归作者所有。请勿转载和采集!