Spider Climbing a Wall: How Many Days to Reach the Top?
Each day, the spider climbs up 50.0 cm and slips down 30.0 cm. This means that each day, the spider makes a net progress of 50.0 cm - 30.0 cm = 20.0 cm.
To reach a 3.00 m wall, the spider needs to climb a total of 3.00 m * 100 cm/m = 300 cm.
Therefore, the spider will need 300 cm / 20.0 cm/day = 15 days to reach the top of the wall. Answer: 15.
原文地址: https://www.cveoy.top/t/topic/Jd3 著作权归作者所有。请勿转载和采集!