(3) The construction period of the combined distribution room noise reduction system is short, reducing the on-site operation time and scope, and minimizing disturbing factors such as noise and dust. Against the backdrop of vigorously promoting the development of new energy, the noise reduction system of combined distribution rooms is being widely promoted and applied in the construction of charging infrastructure.

请将以下内容灵活、准确地翻译成英语:3组合式配电房降噪系统施工周期短减少了现场作业时间及范围减少噪音、扬尘等扰民因素。在推进新能源大力发展的背景下充电基础设施新建工程中组合式配电房降噪系统被大力推广应用。

原文地址: http://www.cveoy.top/t/topic/hlLl 著作权归作者所有。请勿转载和采集!

免费AI点我,无需注册和登录