We conducted an on-site inspection of the silo and found that there was no mechanical ventilation equipment installed. Furthermore, the dock personnel informed us that temperature measuring devices were not present in the silo, and they typically rely on infrared thermometers to measure the temperature of the outer wall.

Moreover, we discovered that silo number 12, which was supposed to be the first to receive goods, did not adhere to the first-in-first-out principle for shipment. This raises concerns about the consignee's handling of the silo, as they only initiated the cleaning process in June, potentially neglecting the issue. Consequently, we believe that the consignee failed to fulfill their obligation to minimize losses to the maximum extent possible.

We entered the silo for inspection on-site but no mechanical ventilation equipment was found At the same time the dock personnel also claimed that the silo was not equipped with temperature measu