Following necessary preparations, the cargo loading operation, under our supervision, commenced at approximately 21:10hrs on September 11, 2023, at L12 berth. Three shore cranes were utilized for the operation. Loading at L12 berth concluded successfully at 07:40hrs on September 12, 2023. The vessel then proceeded to the anchorage. After a waiting period of several hours, the vessel shifted to G3 berth to continue the cargo loading process.